Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

For information on troubleshooting, service, replacement parts, see: Load Bank user manual

...

Safety

Arc Flash safety … (add details)

Connecting and disconnecting cables between Sources and Loads must be done by a qualified DKIST Tech.

Setup to Load test the Generator

...

Open Automatic Transfer Switch front door. Select ‘Inhibit’ on the toggle switch mounted on the ATS cabinet door.

...

Locate the Load Test cables. There are two sets of 4 cables. Each cable has a CamLok connector at each end.

...

Press the ‘Load Dump Bypass’ button

After testing

Turn off Load Bank

Disconnect test cables between Source and Load

Inspect Load Bank …

If the Source is the Generator: at ATS cabinet: select Run