1. Science/Technical Highlight

2. Current Photos

...

3. Directorate

...

4. Science Operations (Alexandra and Andres)

...

4.3 Operations schedule and training activities

5 Technical Operations

...

5.1 Electrical/Electronics

...

5.5 Opto-Mechanical

5.6 Systems Engineering

6 Instrumentation Operations

...

6.1 Facility Instrument Distribution Optics (FIDO)/Polarization Analysis and Calibration (PA&C)

...

  • First ROIC has been delivered. We are working on acceptable ITAR compliance.

  • Short wave detectors look acceptable and are on schedule. Mid-wave detectors will be inspected next.

  • An Operations Concept has been written so that we can begin exploring controllers for these detectors.

  • Schedule planning continues for lab development and future instrument integration.

  • Work on modifications to the DL-NIRSP and cryo-NIRSP related to the IR cameras has been put on hold for higher priority tasks.

7 Data Center Operations

7.1 Hardware Infrastructure

...