1. Science/Technical Highlight
2. Current Photos
...
3. Directorate
...
4. Science Operations (Alexandra and Andres)
...
4.3 Operations schedule and training activities
5 Technical Operations
...
5.1 Electrical/Electronics
...
5.5 Opto-Mechanical
5.6 Systems Engineering
6 Instrumentation Operations
...
6.1 Facility Instrument Distribution Optics (FIDO)/Polarization Analysis and Calibration (PA&C)
...
First ROIC has been delivered. We are working on acceptable ITAR compliance.
Short wave detectors look acceptable and are on schedule. Mid-wave detectors will be inspected next.
An Operations Concept has been written so that we can begin exploring controllers for these detectors.
Schedule planning continues for lab development and future instrument integration.
Work on modifications to the DL-NIRSP and cryo-NIRSP related to the IR cameras has been put on hold for higher priority tasks.
7 Data Center Operations
7.1 Hardware Infrastructure
...