Daniel K. Inouye Solar Telescope

...

1. Science/Technical Highlight (Anyone)

2. Photos (Anyone)

3. Directorate (Thomas and Dave)

3.1 Activities

3.2 Financial Status

  • DKIST operations carried forward approximately $28.16M in unencumbered funds into FY 2023 from previous years.  A total of $X.XXM in new funding has been obligated by NSF thus far in FY 2023 for a total of $YY.YYM.

  • Financial status of

    • DKIST operational expenditures for August 2023 were $Z.ZZM

    • Total YTD expenditures for DKIST operations are $XX.XXM.

    • The average DKIST spending for FY 2023 (burn rate; BR) is $Y.YYM/month.

4. Science Operations (Ali and Andres)

4.1 Cycle 2 Experiment Generation

...

Observing Window

Experiment ID

Observing Date

FIDO Configuration

Proposal Title

OCP2.5

OCP2.4

OCP2.44

eid_2_70

FIDO 3a

Spatio-temporally resolved linear scattering polarization in the Sr I line at 4607 A: a window to the small-scale photospheric magnetism

OCP2.5

eid_2_14

FIDO 1b

Multi-height magnetic observations of a solar active region

OCP2.5

4.3 Operations schedule and training activities

  • Daily schedule during the OCP2.4 5 observing window ( - ):

    • Arrive at DSSC (carpools): 45:45am

    • Leaving DSSC: 56:00am

    • Arriving at site: 67:00am

    • Start Observatory Shutdown: 23:00pm

    • Leaving site: 23:30pm

    • Arrive at DSSC (end of day): 34:30pm

  • Science Operations schedules two Science Operations Specialists (SOS), and one Resident Scientist (RS) to support daily science operations at the summit.

  • One Boulder Scientist participated in training as a Resident Scientist.

5 Technical Operations (Heather and Paul)

5.1 Site & Facility Status

...

6 Instrumentation Operations (Bret, Friedrich, and Dave H.)

6.1 Optics

6.1.1 System Optics

...

6.9 Infrared Cameras

7 Data Center Operations (Bob and Alisdair)

7.1 Hardware Infrastructure

...