Daniel K. Inouye Solar Telescope

...

1. Science/Technical Highlight (Anyone)

2. Photos (Anyone)

3. Directorate (Thomas and Dave)

3.1 Activities

3.2 Financial Status

  • DKIST operations carried forward approximately $28.16M in unencumbered funds into FY 2023 from previous years.  A total of $X.XXM in new funding has been obligated by NSF thus far in FY 2023 for a total of $YY.YYM.

  • Financial status of

    • DKIST operational expenditures for August 2023 were $Z.ZZM

    • Total YTD expenditures for DKIST operations are $XX.XXM.

    • The average DKIST spending for FY 2023 (burn rate; BR) is $Y.YYM/month.

4. Science Operations (Ali and Andres)

4.1 Status of Observing

  • The fourth observing window (OCP2.4) closed on .

  • The Mid-Term-Plan (MTP2.5) for the fifth observing window (OCP2.5, opening on ) was prepared and published.

  • OCP2.5 is dedicated to the FIDO configuration 1b.

  • Email was sent to inform Cycle 2 Proposers of accepted proposals about the opening of OCP2.5. Proposers are typically informed about the opening of a new observing window 1 week prior opening.

  • The fifth observing window (OCP2.5) opened on (and will close on ).

  • was spent on ViSP external focus verification (on-sun activity, Instrumentation Group) and a Cryo-NIRSP straylight mitigation improvement (on-sun activity, Instrumentation Group).

  • Short Term Planning (STP) meetings were prepared and held with the Resident Scientist team on (STP2.4.6), (STP2.5.1), and (STP2.5.2). Short-Term-Planning meetings are held every Friday during an observing window starting the Friday prior opening of the respective observing window.

  • FIDO1b experiments had to be revised and resent to the summit prior opening of the OCP2.5 window (DL-NIRSP IR2 not operational at the start of OCP2.5).

4.1.1 Regular Cycle Observing

...

4.1.3 Parker Solar Probe Co-Observing

N/A.

4.2 Observing Planning

  • The Mid-Term-Plan (MTP2.5) for the fifth observing window (OCP2.5, opening on ) was prepared and published.

  • OCP2.5 is dedicated to the FIDO configuration 1b.

  • Email was sent to inform Cycle 2 Proposers of accepted proposals about the opening of OCP2.5. Proposers are typically informed about the opening of a new observing window 1 week prior opening.

  • Short Term Planning (STP) meetings were prepared and held with the Resident Scientist team on (STP2.4.6), (STP2.5.1), and (STP2.5.2). Short-Term-Planning meetings are held every Friday during an observing window starting the Friday prior opening of the respective observing window.

  • FIDO1b experiments had to be revised and resent to the summit prior opening of the OCP2.5 window (DL-NIRSP IR2 not operational at the start of OCP2.5).

4.3 Operations Schedule and Training Activities

  • Daily schedule during the OCP2.5 observing window ( - ):

    • Arrive at DSSC (carpools): 5:45am

    • Leaving DSSC: 6:00am

    • Arriving at site: 7:00am

    • Start Observatory Shutdown: 3:00pm

    • Leaving site: 3:30pm

    • Arrive at DSSC (end of day): 4:30pm

  • Science Operations schedules two Science Operations Specialists (SOS), and one Resident Scientist (RS) to support daily science operations at the summit.

  • One Boulder Scientist participated in training as a Resident Scientist.

Maybe a new section dedicated to the SOS’s?

4.

...

4 Cycle Preparation

This should be maybe included. Not sure to what detail though.

4.

...

5 Experiment Generation

  • The Cycle 2 experiment generation process has been completed. Nothing new to report.

4.

...

6 Science Operations Management

Hiring process of new SOS is ongoing (Andres to fill in details)

4.

...

7 Science Operations Tools

OpsTools (Proposal Architect work, Experiment Architect work, OPMT work, Loki work) updates/activities should be included here(?) (this is actually Bret or JohnH/HLS and Bob Tawa/OpsTools).

4.

...

7.1 Management

Hiring process for new OpsTool software engineer, interviews scheduled.

5 Technical Operations (Heather and Paul)

5.1 Site & Facility Status

...

6 Instrumentation Operations (Bret, Friedrich, and Dave H.)

6.1 Optics

6.1.1 System Optics

...

6.9 Infrared Cameras

7 Data Center Operations (Bob and Alisdair)

7.1 Hardware Infrastructure

...