Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Daniel K. Inouye Solar Telescope

...

1. Science/Technical Highlight (Anyone)

2. Photos (Anyone)

3. Directorate (Thomas and Dave)

3.1 Activities

3.2 Financial Status

  • DKIST operations carried forward approximately $28.16M in unencumbered funds into FY 2023 from previous years.  A total of $X.XXM in new funding has been obligated by NSF thus far in FY 2023 for a total of $YY.YYM.

  • Financial status of

    • DKIST operational expenditures for August 2023 were $Z.ZZM

    • Total YTD expenditures for DKIST operations are $XX.XXM.

    • The average DKIST spending for FY 2023 (burn rate; BR) is $Y.YYM/month.

4. Science Operations (Ali and Andres)

4.1 Status of Observing

  • The fourth observing window (OCP2.4) closed on .

  • The fifth observing window (OCP2.5) opened on (and will close on ).

  • was spent on ViSP external focus verification (on-sun activity, Instrumentation Group) and a Cryo-NIRSP straylight mitigation improvement (on-sun activity, Instrumentation Group).

...

  • Daily schedule during the OCP2.5 observing window ( - ):

    • Arrive at DSSC (carpools): 5:45am

    • Leaving DSSC: 6:00am

    • Arriving at site: 7:00am

    • Start Observatory Shutdown: 3:00pm

    • Leaving site: 3:30pm

    • Arrive at DSSC (end of day): 4:30pm

  • Science Operations schedules two Science Operations Specialists (SOS), and one Resident Scientist (RS) to support daily science operations at the summit.

  • One Boulder Scientist participated in training as a Resident Scientist.

Maybe a new section dedicated to the SOS’s?

4.4 Cycle Preparation

This should be maybe included. Not sure to what detail though.

4.5 Experiment Generation

...

4.6 Science Operations Management

Hiring process of new SOS is ongoing (Andres to fill in details)

4.7 Science Operations Tools

OpsTools (Proposal Architect work, Experiment Architect work, OPMT work, Loki work) updates/activities should be included here(?) (this is actually Bret or JohnH/HLS and Bob Tawa/OpsTools).

4.7.1 Management

Hiring process for new OpsTool software engineer, interviews scheduled. (Bob to fill in details).

5 Technical Operations (Heather and Paul)

5.1 Site & Facility Status

...

6 Instrumentation Operations (Bret, Friedrich, and Dave H.)

6.1 Optics

6.1.1 System Optics

...

6.9 Infrared Cameras

7 Data Center Operations (Bob and Alisdair)

7.1 Hardware Infrastructure

...