Daniel K. Inouye Solar Telescope

...

1. Science/Technical Highlight (Anyone)

2. Photos (Anyone)

3. Directorate (Thomas and Dave)

3.1 Activities

  • NSF CA/CSA renewal

    • Following the August meetings with NSF regarding the renewal of the Cooperative Agreement (CA) and Cooperative Support Agreement (CSA), T. Rimmele and D. Boboltz consulted with the NSO Director on the impacts of the various plans and timelines for required NSF reports, proposals and reviews including:

      • The NSO Annual Progress Report (APR) for FY23, due November 2023 and the NSO Annual Program Plan for FY24, due January 2024.

      • A 1 (or possibly 2) year extension of the current CA/CSA for management of NSO.

      • Preparation of a Concept of Operations (ConOps) document and subsequent NSF external review.

      • Preparation of a 5-year proposal for the renewal of the CA/CSA for management of NSO.

  • DKIST Cycle 3 call for proposals

    • D. Boboltz prepared a release for Solar News notifying the community of the delayed timeline for Cycle 3 and the move to a new annual schedule for DKIST that includes an extended winter engineering and maintenance period. This release is being reviewed internally.

  • SOLARNET meeting

    • T. Rimmele attended the SOLARNET Congress “Sun in Science and Society”, September 11-15, 2023 in Venice/Mestre (Italy) and presented an overview of the status of DKIST.

  • Boulder Solar Day

    • T. Rimmele and D. Boboltz along with other DKIST staff members attended Boulder Solar Day, September 29 at the High Altitude Observatory in Boulder. T. Schad and D. Kuridze presented recent results from DKIST.

  • AURA Solar Observatory Council (SOC) meeting preparations

    • T. Rimmele prepared a DKIST overview talk for the SOC meeting and D. Boboltz prepared a talk on the DKIST Data Center with input from B. Tawa and A. Davey.

...

  • DKIST operations carried forward approximately $28.16M in unencumbered funds into FY 2023 from previous years.  A total of $11.9M in new funding has been obligated by NSF thus far in FY 2023 for a total funding amount of $40.06M.

  • Financial status of

    • DKIST operational expenditures for August 2023 were $3.05M

    • Total YTD expenditures for DKIST operations are $26.30M.

    • The average DKIST spending for FY 2023 (burn rate; BR) is $2.39M / month.

4. Science Operations (Ali and Andres)

4.1 Status of Observing

  • The fourth observing window (OCP2.4) closed on .

  • The fifth observing window (OCP2.5) opened on (and will close on ).

  • was spent on ViSP external focus verification (on-sun activity, Instrumentation Group) and a Cryo-NIRSP straylight mitigation improvement (on-sun activity, Instrumentation Group).

...

  • Daily schedule during the OCP2.5 observing window ( - ):

    • Arrive at DSSC (carpools): 5:45am

    • Leaving DSSC: 6:00am

    • Arriving at site: 7:00am

    • Start Observatory Shutdown: 32:00pm

    • Leaving site: 3:30pm

    • Arrive at DSSC (end of day): 4:30pm

  • Science Operations schedules two Science Operations Specialists (SOS), and one Resident Scientist (RS) to support daily science operations at the summit.

  • One Boulder Scientist participated in training as a Resident Scientist.

...

4.8 Science Operations Tools

OpsTools (Proposal Architect work, Experiment Architect work, OPMT work, Loki work) updates/activities should be included here(?) (this is actually Bret or JohnH/HLS and Bob Tawa/OpsTools).

4.8.1 Management

Hiring process for new OpsTool software engineer, interviews scheduled. (Bob to fill in details).

5 Technical Operations (Heather and Paul)

5.1 Site & Facility Status

...

6 Instrumentation Operations (Bret, Friedrich, and Dave H.)

6.1 Optics

6.1.1 System Optics

...

  • Several hours of vibration monitoring was done September 7th and 8th. This included data with the Vibrometer mounted on the ViSP bench, wavefront telemetry data, and mechanical accelerometer data taken in coordination with TechOps team. The air handling units (AHUs) were run at various speeds and various equipment was switched off/on. Ongoing analysis of the combined data sets will assist with vibration assessment.

...

  • The November/December engineering plan has been created for instrumentation work during this period.

6.2.2 Wavefront Correction System (WFS)

  • Additional vibration data was collected by the WFS in support of the Instrument System vibration program.

  • A plan has been devised to mitigate the 100Hz vibration of the HOAO fans. Implementation will occur in November.

  • Additional data has been collected to improve the pointing of the light beam to the in

6.2.3 Visible Spectro-Polarimeter (ViSP)

...

6.9 Infrared Cameras

7 Data Center Operations (Bob and Alisdair)

7.1 Hardware Infrastructure

...