Ongoing TechOps support for OCP 2.8
DKIST Access Control System was installed and is up and running. Thanks to Marco / Koki and IT support in getting everything working with the contractor.
Primary Chiller 1 Failure on Sun 8/18 required a full system shutdown. Switched to Chiller 2 on Mon 8/19 with thermal engineer support and back to on-sun mid morning. Repair planned for 8/22.
Review of tasks and planning for engineering 2024D starting 9/9.
InstOps team
Accomplishments
...