  • DKIST is in week 2 of science observing period OCP 2.9 

Events

Personnel

  •   Congratulations to James Hoag on his promoted to Mechanical Engineering Group Lead (Engineering Manager).

SciOps and OpsTools team

Accomplishments

  • The Cycle 3 Time Allocation Committee selected scientific proposals recommended for observation during Cycle 3. The final TAC report was sent to the DKIST Director for approval.

  • Preparation for the Cycle 3 Experiment Generation process in Jira and Confluence.

  • The Chief SOS hiring process is in the final stage.

  • Preparation for release of an updated Experiment Architect tool for usage during the Cycle 3 Experiment Generation process.

  • Co-observing with Parker Solar Probe during its perihelion encounter E21 and co-observing with Solar Orbiter during its remote sensing window RSW#17.

TechOps team

Accomplishments

...

  • Supported OCP 2.9 instrument operations

  • Performed the Infrared camera startup meeting in Boulder to develop management documents and lab system schedule.

  • Signed an IR detector delivery amendment with Raytheon. Short-wave IR detectors due in November.

  • Continued to ITAR-proof the 1st floor Boulder lab.

  • Scott Gregory visited to install and align the MCAO mechanical and optical assemblies in the lab.

  • Had the M9b kickoff meeting with Zygo. Mechanical design meeting scheduled for November.

  • MCAO and M9b tables are ready for shipping to the summit

  • November-January instrument tasks have been scheduled.

...

  • Updated the portal to move Proposal ID and Target type into basic filters

  • Added support for dithered data to the DL-NIRSP trial pipeline

  • Deployed a new host based storage mechanism for postgres databases

EHS team

Accomplishments