  • Supported OCP 2.9 instrument operations

  • Performed the Infrared camera startup meeting in Boulder to develop management documents and lab system schedule.

  • Signed an IR detector delivery amendment with Raytheon. Short-wave IR detectors due in November.

  • Continued to ITAR-proof the 1st floor Boulder lab.

  • Scott Gregory visited to install and align the MCAO mechanical and optical assemblies in the lab.

  • Had the M9b kickoff meeting with Zygo. Mechanical design meeting scheduled for November.

  • MCAO and M9b tables are ready for shipping to the summit

  • November-January instrument tasks have been scheduled.

...