Skip to end of banner
Go to start of banner

2024 May 13

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

Version 1 Next »

OT

  • Stood up a new production Stack on AWS that is completely segregated from the test and development stacks. The new production stack includes more memory, which will alleviate some of the problems the Ops team has had with the AWS servers hanging with large data transfers. This is the culmination of a 3 months effort.

  • Completed Proposal Architect changes required prior to the OCP 3 proposal call. This included changes in available instruments and wavelengths.

DC

  • Reduced the size of quicklook movies that are viewed/downloaded from the portal. A number of movies exceeded 20 minute lengths, which does not fit within the "quick look" description.

  • Repaired issues on the portal related to dates and times.  Previously, it was noticed that some date/times were 

    • not reflecting the actual description of what the date/time was supposed to be.

    • some data/times were local when they should have been UTC.

  • No labels