/
Mount Service Ring Cabinet Access Positions

Mount Service Ring Cabinet Access Positions

Calculated Access Positions

 

Service Ring 601 (east)

Service Ring 602 (west)

P5/P6

P7/P8

P10/P11

 

Service Ring 601 (east)

Service Ring 602 (west)

P5/P6

P7/P8

P10/P11

MER1

70

220

40

100

190

MER2

95

245

65

125

215

MER3

120

270 or -90

90

150

240

MER4

145

295 or -55

115

175

265

MDC1

180

-30*

150

210

300 or -60

MDC1A

205

-5*

175

235

-35

MCC1

235

25

205

265

-5

MCC2

270 or -90

60

240

300 or -60

30

MEJ1A

305 or -55

95*

275 or -85

-25

65

MDC2A

-25

125*

305 or -55

5

95

MDC2

0

150*

-30

30

120

MEJ1

-60

180*

0

60

150

*Service Ring 602 (west) has low overhead clearance due to supporting structure, drive cabinets can not be opened at this location.

Electronic Junction Box and Cabinet Locations

 

Service Ring Platform Locations

 

Reported Access Positions

Position

East Platform

West Platform

Position

East Platform

West Platform

90

M5 Thermal Rack /MER2

MEJ1A

120

M5 Control Rack

MDC2A

140

MER4

 

145

 

MDC2

178

MDC1

 

201

MDC1A

 

233 / 24

MCC1

 

237

 

MER2

270

MCC2

MER3


 

Related content

Telescope Mount Assembly
Telescope Mount Assembly
Read with this
Enclosure Electronic Schematics
Enclosure Electronic Schematics
More like this
Shutting down Beckhoff PLCs (Mount/Coude) for maintenance
Shutting down Beckhoff PLCs (Mount/Coude) for maintenance
Read with this
S&O Floor Layouts (Reference Only)
S&O Floor Layouts (Reference Only)
More like this
Enclosure (EMCS)
Enclosure (EMCS)
Read with this
Top End Optical Assembly Electronic Schematics
Top End Optical Assembly Electronic Schematics
More like this