4.2 Cycle observing progress
Cycle Start Date | Experiment ID | End Observe Date | FIDO Configuration Experiment ID | Proposal Title |
---|---|---|---|---|
OCP2.XMM/DD/YYYY | MM/DD/YYYY | |||
4.3 Operations schedule and training activities
...
5.5 Opto-Mechanical
5.6 Systems Engineering
6 Instrumentation Operations (Bret and Friedrich)
6.1 Facility Instrument Distribution Optics (FIDO)/Polarization Analysis and Calibration (PA&C)
6.2 Wavefront Correction System (WFS)
6.3 Visible Spectro-Polarimeter (ViSP)
6.4 Diffraction Limited Near-Infrared Spectro-Polarimeter (DL-NIRSP)
6.5 Cryogenic Near-Infrared Spectro-Polarimeter (Cryo-NIRSP)
6.6 Multi-Conjugate Adaptive Optics (MCAO)
6.7 Infrared Cameras
7 Data Center
...
Sub-area 1
...
Operations
7.1 Hardware Infrastructure
7.2 Software Infrastructure
7.2.1 Data Center
7.2.2 Portal/Archive
7.3 Science Data Processing
7.3.1 Calibration Pipelines
7.3.1 Data Released
Experiment ID | Proposal Title | Released to (PI or Public) | Release Date |
---|---|---|---|
1
I