DKIST General
Operational Status
DKIST is going went through Shake & Bake 8/5 - 8/6 in preparation for OCP 2.8.
Start of the first week of OCP 2.8.
Events
Visit to DKIST by two NOIRLab the NOIRLab Head of Engineering and one other engineers - 8/13
Visit to DKIST by a Rubin AIV manager - 8/12
...
Identified an issue in the WFC system on 8/7, caused by a failing custom DM controller board. Replacing it with a spare and re-aligning the system fixed the issue
Identified an issue with the Cryo-NIRSP Context Imager camera controller. Issue continues to be investigated.
Identified a problem with the new VBI red power-on script. Issue was mitigated.
Acquired focus data for the DL-NIRSP to verify focus position. Data analysis will commence in the future.
Data Center team
Accomplishments
...