Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Worked on the DKIST Concept of Operations plan.

  • Start of Annual Electrical Panel Maintenance where does not interrupt Eng work.

  • Enclosure Shutter Testing with migrated code.

  • Enclosure cable wrap hose surgical removal with prejudice and start of new hose installation.

  • Aperture plate system valve disassembly / rebuild and system refill and test.

  • 2024-12-18 10.48.31.jpgImage Removed2024-12-18 10.48.31.jpgImage Added

    2024-12-18 10.47.21.jpgImage Added

    2024-12-18 10.47.21.jpgImage Removed2024-12-12 09.32.36.jpgImage Added

  • 2024-12-12 09.32.36.jpgImage Removed2024-12-19 14.55.16.jpgImage Added

    2024-12-19 14.55.16.jpgImage RemovedIMG_2864.jpgImage RemovedIMG_2864.jpgImage Added

InstOps team

Accomplishments

  • Worked on the DKIST Concept of Operations plan.

  • Completed coude installation of the MCAO DM tables and M9b/M9a table.

2024-12-12 11.49.22.jpgImage Removed2024-12-12 11.49.22.jpgImage Added

  • Completed metrology on coude coudé optical systems.

  • Completed review of IR Camera thermal analysis and latest mechanical design iteration.

  • Continued work on MCAO 11km options for manufacture.

  • Closed out all VTF Nov/Dec 2024 campaign tickets.

...