  • The TechOps and InstOps teams worked together to perform the DKIST Shake & Bake 8/5 - 8/6 in preparation for handover to Science Operations.

  • Access Control Panels installed ready for upcoming door control install.

  • Enclosure testing complete with migration of next phase of elev code.

  • Visit with SALT Engineers reviewing discussing options for vent gates.

  • ME & MTechs completed 2 days of ASME training on GD&T.

  • Final Prep for removal of all containers from FAA area complete - transport date 8/13 & 14.

...

DKIST Access Control Panel Installation - photo by Paul Jeffers

Image Added

Back on Sun - photo by Paul Jeffers

InstOps team

Accomplishments

  • Identified an issue in the WFC system on 8/7, caused by a failing custom DM controller board. Replacing it with a spare board and re-aligning the system fixed the issue.

  • Identified an issue with the Cryo-NIRSP Context Imager camera controller. Issue continues to be investigated.

  • Identified a problem with the new VBI red power-on script. Issue was mitigated.

  • Acquired focus data for the DL-NIRSP to verify focus position. Data analysis will commence in the future.

  • Prepared VISP for flare observations, an.

Data Center team

Accomplishments

...