For the month of June, DKIST continued weeks 2-6 of OCP2.7 science observing.
The DKIST Directorate prepared for and presented to the NSF’s 2-year extension proposal review held June 4-6, 2024.
...
DKIST operations carried forward approximately $13.82M in unencumbered funds into FY 2024 from previous years. A total of $14.00M in new funding has been obligated by NSF thus far in FY 2024.
Financial status of
DKIST operational expenditures for the current month were $2.47M
Total YTD expenditures for DKIST operations are $17.64M.
Total outstanding encumbrances are $10.61M.
The average DKIST spending for the past 12 months (burn rate; BR) is $2.51M / month.
4. Science Operations (Ali and Andres)
4.1 Status of Observing
4.1.1 Regular Cycle Observing
...
4.7 Science Operations Tools
...
Completed the beta version of the new Experiment architect and released it for testing by the science users.
began working on the EA templating - gathering requirements and gaining an understanding of how the scientists buid experimenets and were the time reduction can be easily made.
Removed the calls to from Ops tools related to the “proposal completion” message, which had been stripped from the ICD previously
Completed a backend update to Docker v25.0.3
4.7.1 Management
...
Provided Operational support to the science team related to proposal call cycle.
Prepared and delivered slides for the NSF review relating to the work that the OT software team did and was currently doing in supprot of science Ops.
5 Technical Operations (Paul)
5.1
...
Site & Facility Status
5.
...
2 General Site & Facility Repairs, Improvements & Upgrades
...
Vestibule Design and Fabrication/Construction solicitation
Received quote for Vestibule Steel Fabrication. Followed up with other vendors.
...
Reviewed 50% design package for elevator vent redesign
Corresponding with M3 on any questions they may have regarding the elevator vent louvers. Need to take more pictures when time and techs are available.
Completed Kick-Off meeting with M3 for elevator vent redesign. Sent out the precast sealant and elevator submittals.
...
Power outage support/recovery; Restarted Regular, Generator, and UPS, communication, and thermal systems.
...
Chiller 02 urgent troubleshooting, leak in system 2 resulted in lost refrigerant charge
JCI fixed cracked tee in System 2 discharge line and recharged refrigerant
RFQ for service contract, vendor rep visit onsite.
Chiller 05/06 PM and troubleshooting visit
...
Both chillers wer tuned, topped off, inspected
...
...
Both circuits on CH06 were low, circuit 2 had a leak at the pressure relief valve connection
5.
...
3 Electrical/Electronics/PLC and Facility Management System
5.3.1 Highlights of Recurring Preventative Maintenance Performed in October
...
6 Instrumentation Operations (Bret, Friedrich, and Dave H.)
6.1 Optics
6.1.1 System Optics
...
.
7 Data Center Operations (Bob and Alisdair)
7.1 Hardware Infrastructure
implemented an upgrade to the Asgaard and Dev stack to the Pacific version in preparation/test for deployment to the production stack
7.2 Software Infrastructure
7.2.1 Data Center
Prepared for and presneed the Data Center status to the NSF review panel
Updated the DHS-DC Interface Control Document to address the need for packaging small files into .tar files for faster and more efficient transfer of data from the summit to the data center
updated the Dkist processing stack and REST APIs to Pydantic 2
Scaled airflow out to 256 workers
Installed a new metrics stack - including storage and collection of metrics relating to the infrastructure.
7.2.2 Portal/Archive/Public
Created a list of actionable improvements to the portal from user feedback and began implementing them
Made searches based on Proposal ID and Experiment case insensitive
7.3 Science Data Processing
7.3.1 Calibration Pipelines
VBI
investigated the failure of the VBI pipeline related to the receipt and attempted processing of VBI mosaic pattern with a mosaic pattern that was not N x N (5 mosaic locations). this mode of VBI operation had not been encountered previously
Cryo-NIRSP
Redesigned and implemented the Processing Preparation Worker to include Cryo-NIRSP
Refactored the solar gain task to preform fringe correction based on a parameter
DL NIRSP
Generated integration tests for the DL-NIRSP Pipeline in preparation for he beta version release
Updated the current pipeline to reflect the use of the MISI in the newest data
7.3.1 Data Released
46 new Datasets were created this month and 40 were made pulic
New Datasets
proposalID | Instrument | ObserveDate | CreateDate | EmbargoEndDate | Count |
pid_1_ |
123 |
VBI | 2022- |
10- |
24 | 2024- |
06- |
2023-08-28
3
2024-01-09
2023-08-28
1
2024-01-10
2023-08-28
2
pid_1_97
VISP
2022-06-10
2024-01-23
2023-11-07
2
2024-01-24
2023-11-07
1
2024-01-25
2023-11-07
1
10 | 2024-06-10 | 40 | ||
pid_2_87 | VISP | 2024-06-09 | 2024-06-13 | 2024- |
12- |
11 |
2
2024-01-26
2023-11-07
1
2024-01-27
2023-11-07
1
pid_2_59
VISP
2023-10-27
2024-01-27
2024-07-27
3
6 |
Datasets Made Public
proposalID | Instrument | ObserveDate | CreateDate | EmbargoEndDate | Count |
pid_1_ |
123 |
VBI | 2022- |
2024-01-05
2023-08-28
3
2024-01-09
2023-08-28
1
10 |
- |
2
pid_1_97
VISP
2022-06-10
2024-01-23
2023-11-07
2
24 |
1
2024 |
- |
2023-11-07
1
06- |
2024-01-24
2023-11-07
2
2024-01-26
2023-11-07
1
2024-01-27
2023-11-07
1
pid_2_27
VISP
2023-06-29
2023-07-22
2024-01-20
4
pid_2_29
VISP
2023-06-29
2023-07-22
2024-01-20
3
2023-06-30
2023-07-23
2024-01-20
3
pid_2_64
VISP
2023-05-03
2023-07-22
2024-01-20
3
2023-07-26
2024-01-20
2
2023-07-27
2024-01-20
1
pid_2_75
VISP
2023-06-28
2023-07-22
2024-01-20
5
2023-08-02
2024-01-20
3
pid_2_85
VISP
2023-05-09
2023-07-23
2024-01-21
3
2023-11-01
2023-11-14
2024-01-21
6
pid_2_95
VISP
2023-05-01
2023-07-22
2024-01-19
10 | 2024-06-10 | 40 |