Daniel K. Inouye Solar Telescope
Monthly Operations Report
Status as of July 31, 2023
Table of Contents
1. Science/Technical Highlight
2. Current Photos (if anyone has any???)
3. Directorate (Thomas and Dave)
4. Science Operations (Alexandra and Andres)
4.1 Cycle experiment generation progress
4.2 Cycle observing progress
Cycle | Start Date | End Date | FIDO Configuration | Experiment ID | Proposal Title |
---|---|---|---|---|---|
OCP2.X | MM/DD/YYYY | MM/DD/YYYY | |||
4.3 Operations schedule and training activities
5 Technical Operations (Heather and Paul)
5.1 Electrical/Electronics
5.2 Facility Management System
5.3 Site IT/Software
5.4 Mechanical
5.5 Opto-Mechanical
5.6 Systems Engineering
Instrumentation Operations (Bret and Friedrich)
Facility Instrument Distribution Optics (FIDO)/Polarization Analysis and Calibration (PA&C)
Wavefront Correction System (WFS)
Visible Spectro-Polarimeter (ViSP)
Diffraction Limited Near-Infrared Spectro-Polarimeter (DL-NIRSP)
Cryogenic Near-Infrared Spectro-Polarimeter (Cryo-NIRSP)
Multi-Conjugate Adaptive Optics (MCAO)
Infrared Cameras
Data Center
Sub-area 1
Sub-area 2
1
I