Daniel K. Inouye Solar Telescope

Monthly Operations Report

Status as of Month DD, YYYY


Table of Contents


1. Science/Technical Highlight

2. Current Photos (if anyone has any???)

3. Directorate (Thomas and Dave)

4. Science Operations (Alexandra and Andres)

4.1 Cycle experiment generation progress

4.2 Cycle observing progress

Cycle

Experiment ID

Observe Date

FIDO Configuration

Proposal Title

OCP2.X

MM/DD/YYYY

4.3 Operations schedule and training activities

5 Technical Operations (Heather and Paul)

5.1 Electrical/Electronics

5.2 Facility Management System

5.3 Site IT/Software

5.4 Mechanical

5.5 Opto-Mechanical

5.6 Systems Engineering

6 Instrumentation Operations (Bret and Friedrich)

6.1 Facility Instrument Distribution Optics (FIDO)/Polarization Analysis and Calibration (PA&C)

6.2 Wavefront Correction System (WFS)

6.3 Visible Spectro-Polarimeter (ViSP)

6.4 Diffraction Limited Near-Infrared Spectro-Polarimeter (DL-NIRSP)

6.5 Cryogenic Near-Infrared Spectro-Polarimeter (Cryo-NIRSP)

6.6 Multi-Conjugate Adaptive Optics (MCAO)

6.7 Infrared Cameras

7 Data Center Operations (Bob and Alisdair)

7.1 Hardware Infrastructure

7.2 Software Infrastructure

7.2.1 Data Center

7.2.2 Portal/Archive

7.3 Science Data Processing

7.3.1 Calibration Pipelines

7.3.1 Data Released

Experiment ID

Proposal Title

Observe Date

Release Date (PI)

Release Date (Public)

MM/DD/YYYY

MM/DD/YYYY

MM/DD/YYYY