Table of Contents
1. Science/Technical Highlight (Anyone)
2. Photos (Anyone)
3. Directorate (Thomas and Dave)
3.1 Activities
3.2 Financial Status
DKIST operations carried forward approximately $28.16M in unencumbered funds into FY 2023 from previous years. A total of $X.XXM in new funding has been obligated by NSF thus far in FY 2023 for a total of $YY.YYM.
Financial status of
DKIST operational expenditures for August 2023 were $Z.ZZM
Total YTD expenditures for DKIST operations are $XX.XXM.
The average DKIST spending for FY 2023 (burn rate; BR) is $Y.YYM/month.
4. Science Operations (Ali and Andres)
4.1 Cycle 2 Experiment Generation
The Cycle 2 experiment generation process has been completed. Nothing new to report.
4.2 Cycle 2 Observing
tbd.
Observing Window | Experiment ID | Observing Date | FIDO Configuration | Proposal Title |
---|---|---|---|---|
OCP2.5 | ||||
OCP2.4 | ||||
OCP2.4 |
4.3 Operations schedule and training activities
Daily schedule during the OCP2.4 observing window ( - ):
Arrive at DSSC (carpools): 4:45am
Leaving DSSC: 5:00am
Arriving at site: 6:00am
Start Observatory Shutdown: 2:00pm
Leaving site: 2:30pm
Arrive at DSSC (end of day): 3:30pm
Science Operations schedules two Science Operations Specialists (SOS), and one Resident Scientist (RS) to support daily science operations at the summit.
5 Technical Operations (Heather and Paul)
5.1 Site & Facility Status
5.2 Site & Facility Repairs, Improvements & Upgrades
5.2.1 Electrical/Electronics
5.2.2 Facility Management System
5.3 Mechanical/Thermal
5.4 Opto-Mechanical
5.5 Issues & Concerns
Environmental Safety & Health
6 Instrumentation Operations (Bret, Friedrich, and Dave H.)
6.1 Optics
6.1.1 Facility Instrument Distribution Optics (FIDO)
6.1.2 Polarization Analysis and Calibration (PA&C)
6.2 Summit Instrumentation
6.2.1 Wavefront Correction System (WFS)
6.2.2 Visible Spectro-Polarimeter (ViSP)
6.2.3 Diffraction Limited Near-Infrared Spectro-Polarimeter (DL-NIRSP)
6.2.4 Cryogenic Near-Infrared Spectro-Polarimeter (Cryo-NIRSP)
6.2.5 Visible Broadband Imager
6.7 Multi-Conjugate Adaptive Optics (MCAO)
6.8 High Level Software (HLS)
6.9 Infrared Cameras
7 Data Center Operations (Bob and Alisdair)
7.1 Hardware Infrastructure
7.2 Software Infrastructure
7.2.1 Data Center
7.2.2 Portal/Archive
7.3 Science Data Processing
7.3.1 Calibration Pipelines
7.3.1 Data Released
There were a total of XX data sets released to their PIs and a total of YY data sets released to the public this month.
DataSets Released to PIs
Proposal ID | Instrument | Observe Date | Release Date (PI) | Release Date (Public) |
---|---|---|---|---|
Datasets Made Public
Proposal ID | Instrument | Observe Date | Release Date (Public) |
---|---|---|---|