Skip to end of banner
Go to start of banner

2023 September

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 7 Next »

Daniel K. Inouye Solar Telescope

Monthly Operations Report

Status as of September 30, 2023

Table of Contents

1. Science/Technical Highlight (Anyone)

2. Photos (Anyone)

3. Directorate (Thomas and Dave)

3.1 Activities

3.2 Financial Status

  • DKIST operations carried forward approximately $28.16M in unencumbered funds into FY 2023 from previous years.  A total of $X.XXM in new funding has been obligated by NSF thus far in FY 2023 for a total of $YY.YYM.

  • Financial status of

    • DKIST operational expenditures for August 2023 were $Z.ZZM

    • Total YTD expenditures for DKIST operations are $XX.XXM.

    • The average DKIST spending for FY 2023 (burn rate; BR) is $Y.YYM/month.

4. Science Operations (Ali and Andres)

4.1 Cycle 2 Experiment Generation

  • The Cycle 2 experiment generation process has been completed. Nothing new to report.

4.2 Cycle 2 Observing

  • tbd.

Observing Window

Experiment ID

Observing Date

FIDO Configuration

Proposal Title

OCP2.5

OCP2.4

OCP2.4

4.3 Operations schedule and training activities

  • Daily schedule during the OCP2.4 observing window ( - ):

    • Arrive at DSSC (carpools): 4:45am

    • Leaving DSSC: 5:00am

    • Arriving at site: 6:00am

    • Start Observatory Shutdown: 2:00pm

    • Leaving site: 2:30pm

    • Arrive at DSSC (end of day): 3:30pm

  • Science Operations schedules two Science Operations Specialists (SOS), and one Resident Scientist (RS) to support daily science operations at the summit.

5 Technical Operations (Heather and Paul)

5.1 Site & Facility Status

5.2 Site & Facility Repairs, Improvements & Upgrades

5.2.1 Electrical/Electronics

5.2.2 Facility Management System

5.3 Mechanical/Thermal

5.4 Opto-Mechanical

5.5 Issues & Concerns

Environmental Safety & Health

6 Instrumentation Operations (Bret, Friedrich, and Dave H.)

6.1 Optics

6.1.1 Facility Instrument Distribution Optics (FIDO)

6.1.2 Polarization Analysis and Calibration (PA&C)

6.2 Summit Instrumentation

6.2.1 Wavefront Correction System (WFS)

6.2.2 Visible Spectro-Polarimeter (ViSP)

6.2.3 Diffraction Limited Near-Infrared Spectro-Polarimeter (DL-NIRSP)

6.2.4 Cryogenic Near-Infrared Spectro-Polarimeter (Cryo-NIRSP)

6.2.5 Visible Broadband Imager

6.7 Multi-Conjugate Adaptive Optics (MCAO)

6.8 High Level Software (HLS)

6.9 Infrared Cameras

7 Data Center Operations (Bob and Alisdair)

7.1 Hardware Infrastructure

7.2 Software Infrastructure

7.2.1 Data Center

7.2.2 Portal/Archive

7.3 Science Data Processing

7.3.1 Calibration Pipelines

7.3.1 Data Released

  • There were a total of XX data sets released to their PIs and a total of YY data sets released to the public this month.

DataSets Released to PIs

Proposal ID

Instrument

Observe Date

Release Date (PI)

Release Date (Public)

Datasets Made Public

Proposal ID

Instrument

Observe Date

Release Date (Public)

  • No labels