Skip to end of banner
Go to start of banner

2024 - Quarter 3

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 9 Next »

Q3 Questions:

Q3 Highest Priorities for each group:

  • Science Ops

    • S&B July 29, 30 July 31

    • Sept. 6

    • S&B 23, 24 or 24, 25 back on sun 26 or 27

  • Technical Ops

  • Instrumentation Ops

  • Data Center

Group Priorities for Q3 (Schedule details to be worked out between the groups)

29-Apr202406-May13-May20-May27-May03-Jun10-Jun17-Jun24-Jun01-Jul08-Jul15-Jul22-Jul29-Jul05-Aug12-Aug19-Aug26-Aug02-Sep09-Sep16-Sep23-Sep30-SepFIDO reconfig VTF testsFIDO reconfig for OCP2.7S&B 5/8-5/9M1/optics cleaningS&B 7/29-7/30S&B 9/23-9/24
Overall
Science Ops
Tech Ops
Inst Ops
Data Center

OCP 2.7 5/27 - 7/9

Eng. 2024c 7/15-7/25

OCP 2.8 7/31 - 9/6

Engineering 2024d 9/9 - 9/?

OCP 2.9 9/? - 11/?

Engineering 2024f 11/? - 11/?

Engineering 2025a 1/2 - 1/31

InstOps 2024d on Sun

InstOps 2024e on Sun

OCP 3.0

Engineering 2024e

Low-intensity Mintenance

Bar 2

Cycle 3 call preparation and release

Cycle 2.X / eclipse / SolO / PSP proposal prep

OCP 2.7 observing

OCP2.6 / Eclipse / SolO / PSP observations 3/13 - 4/26 - 4/

OCP 2.8 observing

PSP SolO co-obs 9/31-10/19

Major PM items

Bearing Trucks

Regular PM

Non-concurrent PM

Non-concurrent PM

Concurrent PM & SciOps support

Non-concurrent PM

Concurrent PM & SciOps support

VTF installation

Cryo-NIRSP warm heads + other instrumentation tasks

On-Sun Instrument tests (e.g., MISI-36) 3/13 - 4/5

VTF assemb. IPL

VTF Install (GOS)

VTF GOS light required

Addl. Inst.

VTF 1-etalon on Sun????

VTF??

ViSP testing on Sun

DL-NIRSP (4 tasks), Cryo

VTF

ViSP tasks

Concurrent Instr. PM & SciOps Support

Concurrent Instr. PM & SciOps Support

Cryo-NIRSP pipeline work

Complete Manual Processing Worker (MPW)

Complete Algorithm Change Proposal (ACP) process

Quality Report Framework update

Cryo-NIRP Acceptance

DL-NIRSP Beta

Movies to Vimeo

Upgrade Ceph to Quincy

Experiment Architect Templating Design

Globus Accounting changes

DL NIRSP acceptance

Cryo-NIRSP data processing and publication

Team

Members

On Maui

Sci Ops


Tech Ops


Inst Ops


Data Center






  • No labels