2024 - Quarter 4

2024 - Quarter 4

Q4 Questions:

  • All: Given the holidays in December and expectations of vacations, what do we want to do in December, especially at the end of the month?

    • We discussed this at the June 13 meeting. Where we landed is December is engineering. I left a gap for the week of Christmas/New Year’s assuming most staff on vacation.

  • All: Are we going into an engineering period for the month of January?

    • SciOps has planned to go back on sun only in February for Cycle 3 observing. We are not prepared to be ready in January.

  • InstOps:

    • What is the Q4 plan for VTF? Will we have the KIS team out in November?

      • Possibly. VTF work in November would be completion of Etalon 1 installation (no Etalon 2 work). KIS will need to determine their status on Etalon 2 work in Freiburg before deciding whether to come to Maui in November. Next meeting to discuss in July.

  • SciOps:

    • What are the SolO and Parker windows we want to hit in Q4? Are there other co-observing opportunities?

      • No there are no other. Supporting SO and PSP is enough additional work.

    • Quarter 4 is the time for preparation of Cycle 4. What are the capabilities but more important what is the time available? We need to discuss what to make available. This is technically the first non-OCP Call.

  • TechOps: What is the longest non-concurrent PM/Upgrade we have this quarter?

    •  

  • InstOps/TechOps:

    • Can the InstOps/TechOps tasks be accomplished concurrently in the November Engineering period?

      •  

 

Q4 Highest Priorities for each group:

  • Science Ops

    • May need to discuss extension for Sunrise co-observing.

    • PSPE21 on 9/30. This is a Cryo-NIRSP observation only.

    • October 1: Solar Orbiter co-observing: R_BOTH_HRES_HCAD_Filament_Prominence - high-resolution observations of prominence at West limb, close to Earth quadrature (~4hrs) - pVSTP - FOR DKIST: on-disk filament observation SOOP Coordinators: T. Kucera, S. Parenti

    • October 2 - 19: different co-observing programs: AR Long Term (multiple days - may not be consecutive), SMALL_MRES_MCAD_Earth-Quadrature - high-resolution observations of target at West limb, close to Earth quadrature (~2hrs) - pVSTP SOOP Coordinator: P. Chitta, SMALL_HRES_HCAD_RS-burst 30 mins of EUI super high cadence observations - pVSTP Moved to 19 October during DKIST-available time (1800-2200 hrs, depending on when best fits the SPICE observations for Fast Wind).

    • Need to continue with FIDO 3a AND 3c experiments. Configuration for Solar Orbiter should be 3c - need for FIDO changes of CL2a position - hot swap testing FIDO-150.

    • Support on two saturdays instead of sundays.

    • Other science operations priorities:

      • Experiment generation for Cycle 3 start: ideally we need to know at that point what DL modes to include.

      • Cycle 4 Proposal Call preparation in full swing.

      • Testing of Cycle 4 configurations? We did not want to offer untested configurations anymore.

      • Rolling shutter for ViSP: increase of operational efficiency (no more NDs) and increased frame rate at same exposure time at the cost of lower SNRs and exposure time testing starting from scratch.

      • DL-NIRSP SV with Cycle 2 experiments continued → visible camera needs to be implemented, focused (float?) → required for Cycle 4 preparation, need to know what to offer.

      • Testing of 50/50 and 70/30 BS.

      • ViSP modulator replacement: beam wobble mitigation.

      • Step one in prep for ViSP beam attenuators: put the mounts in.

  • Technical Ops

    • OCP2.9

      • surplus material disposal and Haz material storage org and inventory

      • baseyard packing of plate coil boxes into Containers and reorg of baseyard.

      • Site EV Charger (x2) installation.

      • Main UPS servicing & repair (S&B and first day of ops ) - small risk to obs.

      • ongoing con-current maintenance.

    • Eng 2024E (& 2025A)

      • VTF support etech/ mtech / ME & EE.

      • Removal (and replacement) of the Enclosure Cable Wrap Hoses for TMW and HW. 3 to 4 weeks of non movement on the enclosure. Can be broken into parts ie one hose at a time.

      • Annual Electrical Distribution System Panel Maintenance - site wide electrical outage approx 4 days provisional plan Wed 1/8 to Sat 1/11 with Sun 1/12 as contingency and system restart on Mon 1/13.

      • Upgrade of PESDs for voltage absence and voltage presence detection on main system drive disconnects.

      • UB Electrical Tie-In for Solar Panels - site outage for 2 days.

      • Enclosure Az Drive tuning with Siemens Tech on site - 1 week

      • CDU server Room switch over for Row A & B ???? - 3 to 4 weeks no cooling - unlikely.

      • Coude LIC Refurbish - 2 weeks with no motion & permanent estop.

  • Instrumentation Ops

    • InstOps needs two/three weeks to warm Cryo-NIRSP, open to install new resolvers, and cool down.

      • Plan was for 2025/Q1 (January), assuming there is 3 weeks of engineering

      • Other CN work: leak checks, cold-head duty cycle, new slit masks, broken filter holders, 2nd grating base, replacement of grating harmonic drive.

    • InstOps would like to install MCAO 4km DM table and M9b table.

      • Arrival of tables by November will be possible but challenging. January would be ok but would overcommit InstOps for work this month (working along with CN, MISI-116).

      • This keeps the MCAO and M9b work on schedule for initial frame installation in winter 2025/26.

      • Would require crane, opening of floor, realignment of M9a onto new table.

    • Potential MISI-116 installation

      • November not possible, January may be possible.

      • Still lots of smaller parts to be built, including several moving mechanisms.

      • Next opportunity for installation may be winter 2025/26.

    • Numerous smaller tasks to be done in either Nov or Jan engineering period

      • ViSP filter holders. ViSP beam-balancing optics and testing.

      • More GOS cover work, depending upon repairs in July and Sep.

      • Optics as-built metrology.

      • DL-NIRSP modulator cooling.

      • Potential removal and shipment of VTF cameras for single-gain upgrade.

      • Discuss possibility for further vibration campaign work during winter shutdown.

    • HLS

      • Upgrade to Java 17. Extensively test all instruments and systems by executing observations.

      • Install and test tgz data accumulation for Data Center Globus transport.

      • Upgrade login security.

      • Potentially move engineering data storage services to Amazon Web Services

  • Data Center

    • Finish Cryo-NIRSP pipeline acceptance and begin Processing Cryo-NIRSP backlog

    • Finish DL-NIRSP Beta Pipeline and begin acceptance cycle(s)

    • Move all quicklook movies to Vimeo - For Back-up and bandwidth savings

    • Upgrade the Ceph cluster to the “Pacific” revision

    • OT - Implement Globus Accounting changes

    • OT - Design Experiment Architect templating solution

 

 

Group Priorities for Q4 (Schedule details to be worked out between the groups)

09-Sep202416-Sep23-Sep30-Sep07-Oct14-Oct21-Oct28-Oct04-Nov11-Nov18-Nov25-Nov02-Dec09-Dec16-Dec23-Dec30-Dec06-Jan202513-Jan20-Jan27-Jan03-Feb10-Feb17-Feb24-FebS&B 9/23-9/24FIDO reconfig ???S&B 11/25-11/26
Overall
Science Ops
Tech Ops
Inst Ops
Data Center

OCP 2.7 5/27 - 7/9

Eng. 2024c 7/22-8/2

OCP 2.8 8/7 - 9/6

Eng. 2024d 9/9 - 9/20

OCP 2.9 9/25 - 11/10

Engineering 2024f 11/? - 11/?

Engineering 2025a 1/2 - 1/31

InstOps 2024e on Sun

OCP 3.0

Eng. 2024e 11/11-11/22

Low-intensity Mintenance

InstOps 2025a on Sun

Bar 2

Cycle 3 call preparation and release

Cycle 2.X / eclipse / SolO / PSP proposal prep

OCP 2.7 observing

OCP2.6 / Eclipse / SolO / PSP observations 3/13 - 4/26 - 4/

OCP 2.8 observing

PSP SolO co-obs 9/31-10/19

Major PM items

Bearing Trucks

Regular PM

Non-concurrent PM

Non-concurrent PM

Concurrent PM & SciOps support

Non-concurrent PM

Non-concurrent PM and Major Upgrades

VTF installation

Cryo-NIRSP warm heads + other instrumentation tasks

On-Sun Instrument tests (e.g., MISI-36) 3/13 - 4/5

VTF assemb. IPL

VTF Install (GOS)

VTF GOS light required

Addl. Inst.

VTF tasks

ViSP testing on Sun

DL-NIRSP (4 tasks), Cryo

VTF on Sun

ViSP tasks

Cryo-NIRSP pipeline work

Complete Manual Processing Worker (MPW)

Complete Algorithm Change Proposal (ACP) process

Quality Report Framework update

Cryo-NIRP Acceptance

DL-NIRSP Beta

Movies to Vimeo

Upgrade Ceph to Quincy

Experiment Architect Templating Design

Globus Accounting changes

DL NIRSP acceptance

Cryo-NIRSP data processing and publication

 

Q4 Shift Pattern

https://docs.google.com/spreadsheets/d/1-wIzUsrqRgWFCiHZQ6PL32nPj1EDdg0a1mwuZdVYr9Y/edit?gid=391699390#gid=391699390

 

 

Related content

ConOps Plan Mind Map and Outline
ConOps Plan Mind Map and Outline