2025 - Quarter 3 (1 July - 30 Sept.)

2025 - Quarter 3 (1 July - 30 Sept.)

Q3 Questions:

  •  

Q3 Highest Priorities for each group:

 

Group Priorities for Q3 2025 (Schedule details to be worked out between the groups)

24-Feb202503-Mar10-Mar17-Mar24-Mar31-Mar07-Apr14-Apr21-Apr28-Apr05-May12-May19-May26-May02-Jun09-Jun16-Jun23-Jun30-Jun07-Jul14-Jul21-Jul28-Jul04-Aug11-Aug18-Aug25-Aug01-Sep08-Sep15-Sep22-Sep29-Sep06-Oct13-Oct20-Oct27-Oct03-Nov10-Nov17-Nov24-Nov01-DecS&B
Overall
Science Ops
Tech Ops
Inst Ops
Data Center

OCP 2.7 5/27 - 7/9

Eng. 2024c 7/22-8/2

OCP 2.8 8/7 - 9/6

Eng. 2024d 9/9 - 9/20

OCP 2.9 9/25 - 11/10

Engineering 2024f 12/9 - 12/20

Engineering 2025a 1/2 - 2/6

InstOps 2024e on Sun

OCP 3.1

Eng. 2024e 11/11-11/22

Low-intensity Mintenance

InstOps 2025a on Sun

ConOps review

Eng. 2025b

Eng. 2025c

Sesame Street

SOC

OCP 3.2

Eng. 2025d

OCP 3.3

Eng. 2025e

OCP 3.4

Bar 2

Cycle 3 call preparation and release

Cycle 2.X / eclipse / SolO / PSP proposal prep

OCP 2.7 observing

OCP2.6 / Eclipse / SolO / PSP observations 3/13 - 4/26 - 4/

OCP 2.8 observing

PSP SolO co-obs 9/31-10/19

SO Co-Obs.

PSP Co-Obs.

Cycle 3 experiment prep.

Cycle 4 Proposal Call prep

OCP 3.1

Major PM items

Bearing Trucks

Regular PM

Non-concurrent PM

Non-concurrent PM

Concurrent PM & SciOps support

Non-concurrent PM

Non-concurrent PM and Major Upgrades

Non-concurrent PM

InstOps Support

InstOps Support

VTF installation

Cryo-NIRSP warm heads + other instrumentation tasks

On-Sun Instrument tests (e.g., MISI-36) 3/13 - 4/5

VTF assemb. IPL

VTF Install (GOS)

VTF GOS light required

Addl. Inst.

VTF tasks

ViSP testing on Sun

DL-NIRSP (4 tasks), Cryo

VTF on Sun

ViSP tasks

InstOps Eng

InstOps on-Sun

Cryo-NIRSP pipeline work

Complete Manual Processing Worker (MPW)

Complete Algorithm Change Proposal (ACP) process

Quality Report Framework update

Cryo-NIRP Acceptance

DL-NIRSP Beta

Movies to Vimeo

Upgrade Ceph to Quincy

Experiment Architect Templating Design

Globus Accounting changes

DL NIRSP acceptance

Cryo-NIRSP data processing and publication

DL-NIRSP

Application Tracing

Ceph Metrics

EA templates

OT- OCS ICD implementation

Q3 Shift Pattern

 

 

Related content