0000 Monthly Ops Report template
Daniel K. Inouye Solar Telescope
Monthly Operations Report
Status as of Month DD, YYYY
Table of Contents
- 1 1. Science/Technical Highlight (Anyone)
- 2 2. Photos (Anyone)
- 3 3. Directorate (Thomas and Dave)
- 4 4. Science Operations (Ali and Andres)
- 5 5 Technical Operations (Heather and Paul)
- 6 6 Instrumentation Operations (Bret, Friedrich, and Dave H.)
- 6.1 6.1 Optics
- 6.2 6.2 Summit Instrumentation
- 6.2.1 6.2.1 Instrument Systems
- 6.2.2 6.2.2 Wavefront Correction System (WFS)
- 6.2.3 6.2.3 Visible Spectro-Polarimeter (ViSP)
- 6.2.4 6.2.4 Diffraction Limited Near-Infrared Spectro-Polarimeter (DL-NIRSP)
- 6.2.5 6.2.5 Cryogenic Near-Infrared Spectro-Polarimeter (Cryo-NIRSP)
- 6.2.6 6.2.6 Visible Broadband Imager
- 6.3 6.7 Multi-Conjugate Adaptive Optics (MCAO)
- 6.4 6.8 High Level Software (HLS)
- 6.5 6.9 Infrared Cameras
- 7 7 Data Center Operations (Bob and Alisdair)
1. Science/Technical Highlight (Anyone)
2. Photos (Anyone)
3. Directorate (Thomas and Dave)
3.1 Activities
3.2 Financial Status
DKIST operations carried forward approximately $QQ.QQM in unencumbered funds into FY 2024 from previous years. A total of $XX.XM in new funding has been obligated by NSF thus far in FY 2024 for a total funding amount of $YY.YYM.
Financial status of Sep 30, 2023
DKIST operational expenditures for the current month were $V.VVM
Total YTD expenditures for DKIST operations are $ZZ.ZZM.
The average DKIST spending for FY 2023 (burn rate; BR) is $B.BBM / month.
4. Science Operations (Ali and Andres)
4.1 Status of Observing
4.1.1 Regular Cycle Observing
Observing Window | Experiment ID | Observing Date | FIDO Configuration | Proposal Title |
---|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
4.1.2 Solar Orbiter Co-Observing
4.1.3 Parker Solar Probe Co-Observing
4.2 Observing Planning
4.3 Science Operations Training Activities
4.4 Science Operations Specialists
4.5 Cycle Preparation
Preparations for the Cycle 3 Call are ramping up.
4.6 Experiment Generation
The Cycle 2 experiment generation process has been completed. Nothing new to report.
4.7 Science Operations Management
4.8 Science Operations Tools
4.8.1 Management
5 Technical Operations (Heather and Paul)
5.1 Site & Facility Status
5.2 Site & Facility Repairs, Improvements & Upgrades
5.3 Electrical/Electronics/PLC and Facility Management System
5.3.1 Highlights of Recurring Preventative Maintenance Performed in ___<month>___
5.3.2 System Repairs & Upgrades
5.4 Mechanical/Thermal
5.4.1 Highlights of Recurring Preventive Maintenance performed in ____<month>______
5.4.2 System Repairs & Upgrades
5.5 Opto-Mechanical
PM, vibe
5.6 Management
5.6.1 Recruitment & Training
*
5.6.2 Environmental Safety & Health
5.6.3 Observatory Community Service, Broadening Participation
6 Instrumentation Operations (Bret, Friedrich, and Dave H.)
6.1 Optics
6.1.1 System Optics
6.1.2 Facility Instrument Distribution Optics (FIDO)
6.1.3 Polarization Analysis and Calibration (PA&C)
6.2 Summit Instrumentation
6.2.1 Instrument Systems
6.2.2 Wavefront Correction System (WFS)
6.2.3 Visible Spectro-Polarimeter (ViSP)
6.2.4 Diffraction Limited Near-Infrared Spectro-Polarimeter (DL-NIRSP)
6.2.5 Cryogenic Near-Infrared Spectro-Polarimeter (Cryo-NIRSP)
6.2.6 Visible Broadband Imager
6.7 Multi-Conjugate Adaptive Optics (MCAO)
6.8 High Level Software (HLS)
6.9 Infrared Cameras
7 Data Center Operations (Bob and Alisdair)
7.1 Hardware Infrastructure
7.2 Software Infrastructure
7.2.1 Data Center
7.2.2 Portal/Archive/Public
7.3 Science Data Processing
7.3.1 Calibration Pipelines
7.3.1 Data Released
DataSets Released to PIs
Proposal ID | Instrument | ObserveDate | CreateDate | Embargo End Date | Count |
---|---|---|---|---|---|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
|
|
|
| ||
|
|
|
| ||
|
|
| |||
|
|
|
| ||
|
|
| |||
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |||
|
|
| |||
|
|
| |||
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
|
|
|
Datasets Made Public
proposal ID | Instrument | ObserveDate | CreateDate | Embargo End Date | Count |
---|---|---|---|---|---|
|
|
|
|
|
|
|
|
| |||
|
|
|
| ||
|
|
|
| ||
|
|
|
|
| |
|
|
| |||
|
|
|
| ||
|
|
| |||
|
|
|
| ||
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
| |
|
|
| |||
|
|
| |||
|
|
|
| ||
|
|
|