2024 August 19 - 23

2024 August 19 - 23

DKIST General

Operational Status

  • DKIST is in week 3 of OCP 2.8.

Events

  • DKIST hosted Shadow the Scientist featuring Dr. Sarah Jaeggli - 8/20.

  • Pau Hana celebrating Sebastien Poupor, Linda Edwards and Sarah Jaeggli was held at the DSSC - 8/22.

  • The Cycle 3 Science Review Committee (SRC) will meet at NSO Boulder - 8/26-8/28.

Personnel

SciOps and OpsTools team

Accomplishments

  • Ongoing observing support for OCP2.8.

  • Continued training activities of new SOS hire.

  • Finalizing the OCP2.9 plan and preparing to schedule science operations support (resident scientist and science operations specialists shift schedules).

  • OpsTool team preparing for the release of a new version of the Operations Panning and Monitoring Tool.

TechOps team

Accomplishments

  • Ongoing TechOps support for OCP 2.8

  • DKIST Access Control System was installed and is up and running. Thanks to Marco / Koki and IT support in getting everything working with the contractor.

  • Primary Chiller 1 Failure on Sun 8/18 required a full system shutdown. Switched to Chiller 2 on Mon 8/19 with thermal engineer support and back to on-sun mid morning. Repair planned for 8/22.

  • Review of tasks and planning for engineering 2024D starting 9/9.

InstOps team

Accomplishments

  • Ongoing Instrumentation support for OCP 2.8

  • VBI: took data for verification of a timing fix impacting the VBI in Rolling Shutter mode, analysis ongoing

  • Cryo-NIRSP: intermittent CI camera controller problem was investigated

  • DL-NIRSP: Field steering mirror issue was diagnosed and fixed

  • VISP: data to verify external focus of VISP was acquired, analysis ongoing

Data Center team

Accomplishments

  • ongoing ingestion and processing of data for OCP 2.8

  • completed cryo-nirsp trial #8 in preparation for Cryo-NIRSP pipeline V1.0

  • Ongoing updates of services for updating of Data Center observability framework to V2.0

 