2024 August 26 - 30

2024 August 26 - 30

DKIST General

Operational Status

  • DKIST is in week 4 of OCP 2.8.

  • DKIST weathered Hurricane Hone on 8/25 with no significant damage.

 

PXL_20240825_160515974.PANO_2.png
Outside DKIST during Hurricane Hone. Photo by Lucas Tarr.

 

Events

  • The Cycle 3 Science Review Committee (SRC) met at NSO Boulder - 8/26-8/28.

Personnel

  •  

SciOps and OpsTools team

Accomplishments

  • Ongoing observing support for OCP2.8.

  • Preparing the tools and workplace for the Experiment Generation process.

  • Completed the science operations support schedule for OCP2.9 (resident scientist and science operations specialists shift schedules).

  • Completed the SOS group schedule to support the on-sun Instrumentation campaign in Nov-Dec.

TechOps team

Accomplishments

  • Ongoing TechOps support for OCP 2.8

  • Pau Hana -> Sebastien Goodbye, Linda Happy Retirement & Sarah Congrats on Tenure.

  • FAA Laydown -end of use and inspection confirmed with FAA Manager.

  • System inspection and recovery, mainly leaks internal from weather due to Hurricane Hone passing by.

  • Detailed planning and resource loading complete for engineering 2024D starting 9/9.

 

Barry post storm Coude Air Handler troubleshooting 20240826.jpg
Barry troubleshooting Coude Environmental System - Photo by Keali’i Koki

 

 

 

InstOps team

Accomplishments

  • Ongoing Instrumentation support for OCP 2.8

  • Planning completed for September engineering work.

  • Contract started for M9b construction.

  • Testing of DL-NIRSP and ViSP software during bad weather.

Data Center team

Accomplishments

  • ongoing ingestion and processing of data for OCP 2.8

  • Completed Cryo-NIRSP trial#8 and released the Cryo-NIRSP pipeline V1.0

  • Began processing the backlog of Cryo-NIRP data in DC stores. Currently at about 75% through the backlog. Estimated failure rate on pipeline runs is currently about 20-25%, mostly due to missing data or problems with correlations These will be triaged after the runs are completed

  • updated the quality report generation to allow 1D binning (a mode that DL-NIRSP uses) in PolCal metrics.

  • Refactored quality metrics code to speed it up. Current DL-NIRSP runs were taking an order of magnitude longer to run than previous instruments.

 