2025 January 13 - 17

2025 January 13 - 17

DKIST General

Operational Status

  • DKIST is in week 2 of Engineering period Eng. 2025a.

 

 

 

 

 

 

 

Events

  • The DKIST Acting AD attended the AAS Winter meeting in Washington DC - Jan. 13-16.

  • The AURA SOC meeting will occur on Maui - Jan. 28-30.

  • DKIST mini-workshop at the SDO 2025 meeting in Boulder - Feb 17-21.

 

 

 

 

 

 

 

SciOps and OpsTools team

Accomplishments

  • Scientists are creating the experiments for Cycle 3 accepted proposals.

  • Registered DKIST User database clean-up continues.

  • Planning of Cycle 4 is ongoing.

  • The SOS Team is completing the SOS Skills Training Program.

  • The SciOps summit schedule to support the on-sun campaign (no science observing) during Eng 2025a in February is in place.

 

 

 

 

 

 

 

TechOps team

Accomplishments

  • Various non-concurrent upgrades and preventative maintenance tasks.

  • Completed the first stage of enclosure cable wrap hose exchange and motion tested.

  • Completed the first stage of enclosure cable wrap hose exchange and motion tested.

  • Recovery from power outage from lightning storm at start of the weekend.

  • Coude LIC strip down and rebuild for failing terminal replacement.

  • Coude LIC strip down and rebuild for failing terminal replacement.

  • Document submission for DKIST Thermal Review.

 

 

MTechs finishing off Encl Cable Wrap Hose Strain Relief - Photo P.Jeffers
Wade in the midst of Coude LIC strip down and rebuild - Photo P.Jeffers

 

 

 

InstOps team

Accomplishments

  • Planning for the M7 alignment. M7 measurements have been taken.

  • HLS Release Kakou_1-rc1 has been deployed to the summit.  Overall the deployment went smoothly but there are are three minor issues that the HLS team expect to resolve quickly.

  • Cryo-NIRSP was opened and internal measurements were taken. Four new filters have been installed in new filter holders, including the two new 4 µ filters.

  • DL-NIRSP IR cameras were pumped and cooled down.

  • New DL-NIRSP MISI-36 entrance aperture mask was installed to eliminate vignetting of two slitlets.

 

 

 

Data Center team

Accomplishments

  • Fixed reporting of Fried parameter (R0) when the adaptive optics (AO) lock is false. The  solution was to remove the ATMOS_R0 header key in cases where AO_LOCK is false and stop storing those values as quality metrics. Also, set limits on the Fried parameter plot in the quality report so that remaining outlandish values will not crush the valid values to an unrecognizable scale. Arrows now point to values that are clearly out of range.

  • Began the annual process of rotating secrets throughout the Data Center stack. This is done during a period of operations downtime (winter) so as to minimize possible impact the the operational cadence of the DKIST (i.e. getting data out to the PIs)

  • Refactored the Snyk vulnerability scans to better support version management. This effort also includes a capability to support a repository-level list of vulnerabilities to ignore.

  • Updated the ViSP documentation to more accurately describe the cause of multiple hairlines in certain Visp plots. These effects are caused by reflections and duct on the slit.

  • Began working on the reprocessing process implementation - reprocessing of L0 data with a new algorithm will create a new version of the L1, keeping only the previous version, and deleting any previous to that (latest-2). The process had been created and agreed on some months ago, but had not been implemented.

  • Continued working through the backlog of datasets that need manual intervention in order for the pipeline to run to completion and create a L1 data set.

 

 

 

 

 

 

 

EHS team

Accomplishments

  • The bi-monthly Safety and Health report was generated and submitted.