/
Electrical Panel Schedules

Electrical Panel Schedules

Electrical Panel Schedules Revision-controlled Vault Location

Copy of current master - Electrical Panel Schedules Update_M3_Site_APR-2021_m3resp

https://docs.google.com/spreadsheets/d/1GkHyiFRGbLoqfKdhqKLtkFy7hq9V9R0yl19XrHABr10/edit?usp=sharing Simplified panel schedules, updated as of 2024-03-20. The circuit identifications are more up-to-date than the above, but missing its detail.

For redlines:

  1. Please download a copy of the current master.

  2. Mark up electronically or by hand.

  3. Add a new line to the table with details and a copy of the redlined pages.

Date of Redline Creation

Affected Sheet #

Initials of Author

Description of Update

Redline Update File

Date of Redline Creation

Affected Sheet #

Initials of Author

Description of Update

Redline Update File

2022-02-24

SB-UPSL4B

EGS

M3/M4/M6 feed optics thermal rack circuit changed from 1P-120V to 2P-208V due to overcurrent condition with original circuit and ePDU. Branch circuit moved from SB-UPSL4B-25 to new 30A breaker on 22,24. Details in TOE-145.

 

 

 

 

 

 

Related content

DKIST Electrical / Electronic / PLC Drawing Index
DKIST Electrical / Electronic / PLC Drawing Index
More like this
Electrical Power Distribution
Electrical Power Distribution
More like this
S&O - Facility Electrical One-Line & Power Plan - E & EP
S&O - Facility Electrical One-Line & Power Plan - E & EP
More like this
S&O - Mechanical Power Plan - EPM & EPMU
S&O - Mechanical Power Plan - EPM & EPMU
More like this
S&O - Grounding Plan - EG
S&O - Grounding Plan - EG
More like this
Lighting Plan and Controls - EL
Lighting Plan and Controls - EL
More like this